Ethiopia site power: paralleling, fuel burn and backup sizing

Ethiopia sites usually run on diesel sets; capacity, paralleling and fuel burn belong in the quotation, and long rains run from March to May and short rains from October to December drives the stoppage days.

Ethiopia site power: paralleling, fuel burn and backup sizing

主要ポイント

  • Site power in Ethiopia runs mainly on diesel sets, long rains run from March to May and short rains from October to December, and peak load often coincides with concreting, welding and dewatering, so capacity and paralleling must be fixed when quoting.
  • For paralleling, check speed droop and voltage droop; mismatched settings leave one set at full load and the other light, and the loaded one fails first.
  • Fuel deviation usually comes from running light: below 40% load a set carbonises and burns more per kWh, while 60-80% is the economical band.

Site power in Ethiopia runs mainly on diesel sets, long rains run from March to May and short rains from October to December, and peak load often coincides with concreting, welding and dewatering, so capacity and paralleling must be fixed when quoting.

For paralleling, check speed droop and voltage droop; mismatched settings leave one set at full load and the other light, and the loaded one fails first.

Fuel deviation usually comes from running light: below 40% load a set carbonises and burns more per kWh, while 60-80% is the economical band.

Where the grid exists but is unstable, use parallel or automatic transfer switching that picks up load within ten seconds, so curing and dewatering continue. When applying this in Ethiopia, have the local agent review it before it goes into the offer.