China Export Manufacturing Circle · 5 recent topics
Côte d'IvoireChen·Verified member · Export inspection2026-10-27Exporting a Chinese 21 t excavator to Côte d'Ivoire: bigger hydraulic cooler?
Site temperature is 38 °C and the client wants 10-hour continuous shifts.
3
China李工·Verified member · Export inspection2026-10-19Client wants delivery in 45 days, the factory slots 70: how to negotiate?
Six units, client starts in August; missing the date loses the order.
3- Nigeria王工·Verified member · Service engineer2026-10-08
Machines for Nigeria: how to configure the tool kit and spare parts package?
First-time buyer of Chinese equipment wants two years of wear parts included.
3 - CameroonSamuel O.·Verified member · Service engineer2026-09-26
Chinese loaders in Cameroon: paint blistered in two months, process or shipping?
Three of five units blistered, mostly on the counterweight and lower frame.
3
Tanzania李工·Verified member · Export inspection2026-09-12SKD assembly abroad: is a 200-unit-a-year line worth the investment?
Local duty gap is 12%, the line costs about USD 600,000.
3
