China Export Manufacturing CircleTanzania2026-09-12

SKD assembly abroad: is a 200-unit-a-year line worth the investment?

李

李工

Verified member · Export inspection

The client's country charges 25% on complete machines and 13% on kits, and he wants an SKD line.

The plan is 200 units a year; assembly line plus test equipment about USD 600,000.

Local power and skilled labour are average, so capacity and quality are uncertain.

Discussion (3)

  • Yusuf B.Verified member · Dealer2026-09-13

    Two hundred units is near break-even: cost local taxes and labour properly, not only the duty gap.

  • Paulo M.Verified member · Project chief engineer2026-09-14

    Budget at least three months of training, with a Chinese team leading the first batch.

  • Kwame A.Verified member · Mine equipment manager2026-09-15

    Do not skip test equipment: incomplete end-of-line testing costs more in rework than the duty saved.

Recent replies in this thread, ordered by posting time

Join the Discussion

Sign in to reply; content appears after review.

Log in to Reply