CASE STUDIES

Cómo llega realmente el equipo al sitio y funciona allí

Los nombres de clientes se omiten por confidencialidad; se mantienen condiciones del sitio, lógica de configuración y rangos verificables. Las cifras son medidas o rangadas durante el período del proyecto.

Publicar necesidad de proyecto

Filtrar por industria y país

6 / 6

Industria
País
Roads & municipalNigeria · Lagos2024 · aproximadamente 7 meses

Equipment package for Lagos urban road rehabilitation

A contractor needed 32 km of road rehabilitation within one rainy-season window; the platform built a schedule-driven equipment list with local operators and parts.

Desafío del sitio

A one-week delay would compress compaction and paving windows, and local parts lead times made downtime a major risk.

  • Equipment split across compaction, paving and haulage to avoid single-brand downtime.
  • Wear-part kits shipped with the fleet plus two standby rollers to cut recovery time.
  • Twelve operators matched from the local pool with model handover and safety induction.

32 km

Road rehabilitated

> 92%

Disponibilidad de flota

45 días

Mobilisation

Equipment package for Lagos urban road rehabilitation
Mining & processingZambia · Copperbelt2023–2025 · Entrega por fases

Load-and-haul combination for an open-pit copper mine

Plant expansion raised stripping volumes; the platform reconfigured the fleet with 90 t excavators and 60 t wide-body tippers, adding a parts warehouse.

Desafío del sitio

Truck tonnage did not match loading capacity, increasing queue time, fuel and tyre costs.

  • Truck-to-loader ratio recalculated from cycle times to cut mutual waiting.
  • Fast-moving parts pre-positioned locally with 48-hour coverage.
  • Driver fatigue management and inspection routines reduced unplanned downtime.

5 : 1

Truck-loader ratio

48 h

Parts lead time

+ 30%

Capacidad de desmonte

Load-and-haul combination for an open-pit copper mine
Lifting & erectionKenia · Nairobi2025 · aproximadamente 2 meses

Steel structure erection for a logistics warehouse

A large-span warehouse with restricted internal roads: an 80 t mobile crane and lift plan supported night-time road closures.

Desafío del sitio

The site sits in a live logistics park; no daytime road occupation, leaving a four-hour night window.

  • Pre-assembly plus panelised lifts shortened each lift cycle.
  • Load charts verified per radius, with superlift and counterweight plan.
  • Local signallers and safety officers coordinated with night lighting and exclusion zones.

1,850 t

Steel erected

4 h / día

Night window

68 días

Duración

Steel structure erection for a logistics warehouse
Ports & logisticsAngola · Luanda2024–2025 · Llegadas por fases

Terminal tractors and handling equipment for a port yard

With rising yard throughput, the platform supplied terminal tractors, reach stackers and forklifts, coordinating port access and on-site service.

Desafío del sitio

The port applies its own emission, noise and access rules, and parts must be replenished by sea.

  • Models selected against the port access checklist with early technical submissions.
  • Six-month parts forecast consolidated into vessel shipments.
  • On-site technicians covered first-year warranty and operator training.

18 unidades

Handling units

By vessel

Parts supply

12 meses

Servicio in situ

Terminal tractors and handling equipment for a port yard
Agriculture & processingEtiopía · Addis Abeba2025 · aproximadamente 5 meses

Turnkey processing line for an agro-processing plant

Cleaning, drying and packaging delivered as one line, with OEM engineers, customs clearance and commissioning coordinated.

Desafío del sitio

Volatile grid power at the site required voltage stabilisation and backup planning at selection stage.

  • Motors and stabilisers configured to local voltage and frequency.
  • Segmented shipping and on-site assembly reduced handling difficulty.
  • Local crew trained for daily cleaning and wear-part replacement.

26 conjuntos

Line equipment

38 días

Commissioning

22 people

Formación local

Turnkey processing line for an agro-processing plant
Equipos usadosRD Congo · Lubumbashi2025 · aproximadamente 3 meses

Inspección por lotes y entrega de una flota usada

A budget-constrained buyer sourced nine used excavators backed by 128-point reports, hour verification and arrival re-inspection.

Desafío del sitio

Used equipment information is opaque, making hours and structural condition hard to verify before shipping.

  • A unified checklist covering hydraulics, structure, electrics and undercarriage.
  • Hours and service records cross-checked with risk grading for anomalies.
  • Local service points re-inspect on arrival, with discrepancies handled per contract.

9 unidades

Unidades entregadas

128 points

Puntos de inspección

9 / 9

Arrival re-check

Batch inspection and delivery of a used fleet

Describa el sitio, obtenga una configuración ejecutable

Comparta ubicación, calendario, alcance del trabajo y rango de presupuesto; la plataforma empareja agentes y OEMs por país y devuelve una lista de equipos, requisitos documentales y asesoramiento sobre personal.

Convertirse en socio de servicio

RELATED

Explorar capacidad de entrega