CASE STUDIES

Wie Ausrüstung tatsächlich vor Ort eintrifft und betrieben wird

Kundennamen werden aus Vertraulichkeitsgründen zurückgehalten; Standortbedingungen, Konfigurationslogik und überprüfbare Bereiche bleiben erhalten. Zahlen sind gemessen oder über den Projektzeitraum gestreut.

Projektanfrage veröffentlichen

Filter nach Branche und Land

6 / 6

Branche
Land
Roads & municipalNigeria · Lagos2024 · ca. 7 Monate

Equipment package for Lagos urban road rehabilitation

A contractor needed 32 km of road rehabilitation within one rainy-season window; the platform built a schedule-driven equipment list with local operators and parts.

Website-Herausforderung

A one-week delay would compress compaction and paving windows, and local parts lead times made downtime a major risk.

  • Equipment split across compaction, paving and haulage to avoid single-brand downtime.
  • Wear-part kits shipped with the fleet plus two standby rollers to cut recovery time.
  • Twelve operators matched from the local pool with model handover and safety induction.

32 km

Road rehabilitated

> 92%

Flottenverfügbarkeit

45 Tage

Mobilisation

Equipment package for Lagos urban road rehabilitation
Mining & processingSambia · Copperbelt2023–2025 · gestaffelte Lieferung

Load-and-haul combination for an open-pit copper mine

Plant expansion raised stripping volumes; the platform reconfigured the fleet with 90 t excavators and 60 t wide-body tippers, adding a parts warehouse.

Website-Herausforderung

Truck tonnage did not match loading capacity, increasing queue time, fuel and tyre costs.

  • Truck-to-loader ratio recalculated from cycle times to cut mutual waiting.
  • Fast-moving parts pre-positioned locally with 48-hour coverage.
  • Driver fatigue management and inspection routines reduced unplanned downtime.

5 : 1

Truck-loader ratio

48 h

Parts lead time

+ 30%

Abtragkapazität

Load-and-haul combination for an open-pit copper mine
Lifting & erectionKenia · Nairobi2025 · ca. 2 Monate

Steel structure erection for a logistics warehouse

A large-span warehouse with restricted internal roads: an 80 t mobile crane and lift plan supported night-time road closures.

Website-Herausforderung

The site sits in a live logistics park; no daytime road occupation, leaving a four-hour night window.

  • Pre-assembly plus panelised lifts shortened each lift cycle.
  • Load charts verified per radius, with superlift and counterweight plan.
  • Local signallers and safety officers coordinated with night lighting and exclusion zones.

1,850 t

Steel erected

4 h / Tag

Night window

68 Tage

Dauer

Steel structure erection for a logistics warehouse
Ports & logisticsAngola · Luanda2024–2025 · gestaffelte Anlieferungen

Terminal tractors and handling equipment for a port yard

With rising yard throughput, the platform supplied terminal tractors, reach stackers and forklifts, coordinating port access and on-site service.

Website-Herausforderung

The port applies its own emission, noise and access rules, and parts must be replenished by sea.

  • Models selected against the port access checklist with early technical submissions.
  • Six-month parts forecast consolidated into vessel shipments.
  • On-site technicians covered first-year warranty and operator training.

18 Einheiten

Handling units

By vessel

Parts supply

12 Monate

Vor-Ort-Service

Terminal tractors and handling equipment for a port yard
Agriculture & processingÄthiopien · Addis Abeba2025 · ca. 5 Monate

Turnkey processing line for an agro-processing plant

Cleaning, drying and packaging delivered as one line, with OEM engineers, customs clearance and commissioning coordinated.

Website-Herausforderung

Volatile grid power at the site required voltage stabilisation and backup planning at selection stage.

  • Motors and stabilisers configured to local voltage and frequency.
  • Segmented shipping and on-site assembly reduced handling difficulty.
  • Local crew trained for daily cleaning and wear-part replacement.

26 Sätze

Line equipment

38 Tage

Commissioning

22 people

Lokale Schulung

Turnkey processing line for an agro-processing plant
Gebrauchte AnlagenDR Kongo · Lubumbashi2025 · ca. 3 Monate

Stichprobenprüfung und Lieferung einer Gebrauchtflotte

A budget-constrained buyer sourced nine used excavators backed by 128-point reports, hour verification and arrival re-inspection.

Website-Herausforderung

Used equipment information is opaque, making hours and structural condition hard to verify before shipping.

  • A unified checklist covering hydraulics, structure, electrics and undercarriage.
  • Hours and service records cross-checked with risk grading for anomalies.
  • Local service points re-inspect on arrival, with discrepancies handled per contract.

9 Einheiten

Gelieferte Einheiten

128 points

Inspektionspunkte

9 / 9

Arrival re-check

Batch inspection and delivery of a used fleet

Beschreiben Sie die Baustelle, erhalten Sie eine ausführbare Konfiguration

Teilen Sie Standort, Zeitplan, Arbeitsumfang und Budgetrahmen mit; die Plattform matcht Agenten und OEMs nach Land und liefert eine Ausrüstungsliste, Dokumentenanforderungen und Personalberatung.

Servicepartner werden