BeastDanceBEASTDANCE.COM
Mining & processingザンビア・銅鉱山地帯2023–2025 · 段階的納品

Load-and-haul combination for an open-pit copper mine

Plant expansion raised stripping volumes; the platform reconfigured the fleet with 90 t excavators and 60 t wide-body tippers, adding a parts warehouse.

Load-and-haul combination for an open-pit copper mine
機密保持のため顧客名は非公開。数値はプロジェクト期間中に測定または範囲指定されたもの。

5 : 1

Truck-loader ratio

48 h

Parts lead time

+ 30%

剥離能力

CHALLENGE

サイト認証

Truck tonnage did not match loading capacity, increasing queue time, fuel and tyre costs.

APPROACH

実績

  1. 01Truck-to-loader ratio recalculated from cycle times to cut mutual waiting.
  2. 02Fast-moving parts pre-positioned locally with 48-hour coverage.
  3. 03Driver fatigue management and inspection routines reduced unplanned downtime.