Mining & processingZambia · Copperbelt2023–2025 · Entrega por fases

Load-and-haul combination for an open-pit copper mine

Plant expansion raised stripping volumes; the platform reconfigured the fleet with 90 t excavators and 60 t wide-body tippers, adding a parts warehouse.

Load-and-haul combination for an open-pit copper mine
Nombre del cliente omitido por confidencialidad; las cifras son medidas o estimadas durante el período del proyecto.

5 : 1

Truck-loader ratio

48 h

Parts lead time

+ 30%

Capacidad de desmonte

CHALLENGE

Desafío del sitio

Truck tonnage did not match loading capacity, increasing queue time, fuel and tyre costs.

APPROACH

Qué hicimos

  1. 01Truck-to-loader ratio recalculated from cycle times to cut mutual waiting.
  2. 02Fast-moving parts pre-positioned locally with 48-hour coverage.
  3. 03Driver fatigue management and inspection routines reduced unplanned downtime.