Mining & processingSambia · Copperbelt2023–2025 · gestaffelte Lieferung

Load-and-haul combination for an open-pit copper mine

Plant expansion raised stripping volumes; the platform reconfigured the fleet with 90 t excavators and 60 t wide-body tippers, adding a parts warehouse.

Load-and-haul combination for an open-pit copper mine
Kundenname aus Vertraulichkeitsgründen anonymisiert; Werte sind gemessen oder als Spanne über den Projektzeitraum angegeben.

5 : 1

Truck-loader ratio

48 h

Parts lead time

+ 30%

Abtragkapazität

CHALLENGE

Website-Herausforderung

Truck tonnage did not match loading capacity, increasing queue time, fuel and tyre costs.

APPROACH

Was wir getan haben

  1. 01Truck-to-loader ratio recalculated from cycle times to cut mutual waiting.
  2. 02Fast-moving parts pre-positioned locally with 48-hour coverage.
  3. 03Driver fatigue management and inspection routines reduced unplanned downtime.