Equipment package for Lagos urban road rehabilitation

A contractor needed 32 km of road rehabilitation within one rainy-season window; the platform built a schedule-driven equipment list with local operators and parts.

Equipment package for Lagos urban road rehabilitation
اسم العميل محجوب للسرية؛ الأرقام مقاسة أو ضمن نطاق خلال فترة المشروع.

32 km

Road rehabilitated

> 92%

توفر الأسطول

45 يوم

Mobilisation

CHALLENGE

تحدي الموقع

A one-week delay would compress compaction and paving windows, and local parts lead times made downtime a major risk.

APPROACH

ما قمنا به

  1. 01Equipment split across compaction, paving and haulage to avoid single-brand downtime.
  2. 02Wear-part kits shipped with the fleet plus two standby rollers to cut recovery time.
  3. 03Twelve operators matched from the local pool with model handover and safety induction.