BeastDanceBEASTDANCE.COM
中国輸出製造クラスターカメルーン2026-09-26

Chinese loaders in Cameroon: paint blistered in two months, process or shipping?

S

Samuel O.

認証メンバー · サービスエンジニア

Five 5 t loaders reached Douala two months ago; three have blisters on the counterweight and lower frame.

Blisters sit where dunnage and straps touched the machines during shipping.

The factory blames sea humidity; we suspect surface preparation. How do we tell?

Discussion (3)

  • Chen認定会員:輸出検査2026-09-27

    Cut one blister open: rust starting at bare metal means preparation; dry paint with no rust points to condensation.

  • Rui C.認定会員:輸出検査2026-09-28

    Condensation at dunnage is common. Anti-rust oil and desiccant cost little and are worth making standard.

  • Fatou D.認証メンバー · 調達責任者2026-09-28

    Photograph before touching up; claims need the factory inspection record, which many orders skip.

Recent replies in this thread, ordered by posting time

ディスカッションに参加

ログインして返信してください。内容は審査後に公開されます。

ログインして返信