ZambiaMining · Mineral ProcessingClosing soon

Tender for Expansion Equipment at Zambian Copper Mine Beneficiation Plant

Buyer
Copperbelt Province Mining Company
Budget reference
USD 8.6M (Reference)
Published
2026-09-28
Deadline
2026-11-08

Conformity requirement

PVoC

Pre-shipment conformity verification authorized by ZABS; customs clearance at destination port requires CoC.

See the scheme and document checklist

Notice summary

Procurement of crushing, screening, and conveying equipment for mineral processing plant expansion, including installation, commissioning, and production acceptance; English tender documents accepted.

Language, qualification and bid-bond requirements are governed by the tenderer's own documents; platform summaries are for information retrieval only.

Tender documents

Bid document checklist

Typical for equipment tenders
  1. 01

    Business licence and company credentials

    Required

    Business licence, import-export rights and sector credentials, in Chinese and English

  2. 02

    Track record for similar projects

    Required

    Supply contracts or acceptance certificates for similar equipment in the past three years; list African experience separately

  3. 03

    Manufacturer authorisation letter

    Required

    Equipment tenders usually require an OEM or regional distributor authorisation with an after-sales commitment

  4. 04

    Annual inspection and maintenance records

    If applicable

    Used equipment requires inspection reports, hour-meter records and maintenance files for major components

  5. 05

    Product conformity certificate

    If applicable

    Pre-shipment certificates such as SONCAP, PVoC or GOEIC COI, as required by the destination country

  6. 06

    Financial and credit standing documents

    Common

    Audited reports for the last two years or a bank reference; some tenders also ask for a credit line statement

  7. 07

    Bid security or bank guarantee

    If applicable

    Amount, form and validity follow the tender document, typically 1%–3% of the bid price

  8. 08

    Delivery and service network commitment

    Common

    State production lead time, loading port and destination service points, with a spare parts supply plan

  9. 09

    Translation and notarisation

    Common

    English or French translations, consular legalisation or notarisation as required by the tender language

This checklist is a general preparation guide; the tender documents and clarifications prevail, including bid-bond percentages.

Get templates