Uganda: used machinery and the PVoC / CoC + ICC
Used machines entering Uganda need age, hours and conformity documents aligned.

النقاط الرئيسية
- Used machinery entering Uganda is checked on age, hours and safety devices alongside conformity documents, and declarations must match the nameplate.
- Since July 2025 Uganda runs an import inspection portal linked to the customs system, with the ICC issued automatically once clearance is completed; the PVoC CoC remains mandatory.
- This compiles public rules for pre-shipment checks; applicable categories, inspection bodies and documents are confirmed by the destination authority and the importer.
Used machinery entering Uganda is checked on age, hours and safety devices alongside conformity documents, and declarations must match the nameplate.
Since July 2025 Uganda runs an import inspection portal linked to the customs system, with the ICC issued automatically once clearance is completed; the PVoC CoC remains mandatory. Controlled products follow the compulsory standards published by UNBS, and used machinery also needs to meet age and safety marking rules.
This compiles public rules for pre-shipment checks; applicable categories, inspection bodies and documents are confirmed by the destination authority and the importer.
تحتاج خطة معدات لهذا السوق؟
انشر طلبك؛ نقوم بتوجيهه إلى الوكلاء المحليين حسب بلد الوجهة ومطابقة عروض الموردين.
اشترك في أخبار الدولة والقطاع
احصل على تحديثات حسب الدولة والقطاع فقط، بدون رسائل غير ذات صلة.
متابعة القراءة
المزيد من القصص حسب البلد والقطاع.

أوغندا · تكنولوجيا المعدات · 2026-10-08
Uganda site power: paralleling, fuel burn and backup sizing

أوغندا · تكنولوجيا المعدات · 2026-08-23
Uganda: storage and transport upgrades around Lake Albert fields, and where tank, vessel and metering purchases focus

أوغندا · تكنولوجيا المعدات · 2026-07-15
Uganda used-machine inspection checklist: structure, hydraulics and hours
