Nigeria integra SONCAP en la ventanilla única, trasladando la certificación y los controles de despacho a línea
Desde marzo de 2026, el Formulario M, solicitudes de certificación y controles de despacho se gestionan a través de la ventanilla única, y la tarifa de supervisión de importación pasa a ser cargo base sobre valor FOB.

Puntos clave
- SONCAP keeps its three steps: exporters obtain the product certificate (PC), importers apply for Form M with it, and the shipment certificate (SC) is issued before shipping.
- The import supervision fee was replaced by an FOB-based levy.
- Most construction machinery falls under the controlled list, so include certification lead time and cost in the quote and state who is responsible in the contract.
SONCAP keeps its three steps: exporters obtain the product certificate (PC), importers apply for Form M with it, and the shipment certificate (SC) is issued before shipping. Since March 2026, Form M, certification and clearance verification are handled online through the single window.
The import supervision fee was replaced by an FOB-based levy. Document consistency matters most: description, model, HS code and quantity must match across PC, Form M, invoice, packing list, B/L and SC.
Most construction machinery falls under the controlled list, so include certification lead time and cost in the quote and state who is responsible in the contract. Confirm details with SON and Nigeria Customs.
¿Necesita un plan de equipos para este mercado?
Publique su demanda; la dirigimos a agentes locales por país de destino y emparejamos cotizaciones de proveedores.
Suscribirse a noticias por país y sector
Reciba actualizaciones por país y sector únicamente, sin correos irrelevantes.
Seguir leyendo
Más historias por país y sector.

