Oversize gensets on RoRo: who supplies the lashing material?
Rui C.
Verified member · Export inspection
Two 40 t gensets by RoRo; the carrier's quote excludes lashing material.
The port requires steel straps and dunnage, which cost twice the domestic price locally.
Who normally pays, and can we ask for a lump-sum inclusion?
Discussion (3)
ChenVerified member · Export inspection2026-10-17
RoRo lashing is normally the carrier's job; charging material separately is common, so agree a lump sum in the booking confirmation.
Thabo M.Verified member · Fleet manager2026-10-18
Bring one set from home with the cargo and top up locally; that saves a lot.
Paulo M.Verified member · Project chief engineer2026-10-19
The lashing plan needs carrier approval; self-bought material may not comply, so ask for the standard first.