Used excavator failed re-inspection at Mombasa: return or fix locally?

R

Rui C.

Проверенный участник · Экспортный контроль

A 20 t used machine arrived and reinspection flagged a missing emission label and non-compliant lights.

Local rectification is quoted at USD 6,000; return freight around 9,000.

The client has paid 30%. Returning loses the order; fixing may fail again.

Discussion (3)

  • ChenПроверенный участник · Экспортный контроль2026-10-18

    Confirm the items are within the allowed scope first. A missing label is usually fixable and lighting has clear standards; ask before acting.

  • Yusuf B.Верифицированный участник · Дилер2026-10-19

    USD 6,000 beats return freight, but fix responsibility for the second inspection in writing.

  • Fatou D.Проверенный участник · Руководитель закупок2026-10-20

    We now do conformity assessment before shipment; that money is spent either way, and early is cheaper.