Spare Parts & ConsumablesSouth Africa2026-10-02

Mine parts stock: how many months before cash gets stuck?

A

Ade O.

Verified member · Procurement lead

Mine parts stock of USD 600,000, turning 1.2 times last year; finance is pushing back.

Downtime costs USD 1,200 an hour, so we dare not cut much.

How do you set stocking tiers? Is there a method to follow?

Discussion (3)

  • Kwame A.Verified member · Mine equipment manager2026-10-03

    Rank by downtime cost times failure probability; the top 20 parts cause 60% of downtime, so stock those fully.

  • Samuel O.Verified member · Service engineer2026-10-04

    Long-lead items are set by sea freight plus clearance; short-lead can go to one month.

  • Yusuf B.Verified member · Dealer2026-10-05

    A regional shared warehouse halves capital tied up; the transfer lead time must be contractual.

Recent replies in this thread, ordered by posting time

Join the Discussion

Sign in to reply; content appears after review.

Log in to Reply