Mali water well to 120 m: heavy mud loss in overburden, how to adjust?

B

Bakary T.

Miembro verificado · Construcción de pozos

Design depth 120 m, overburden of sand and gravel; after 60 m the mud return is only half.

We run bentonite with a little soda ash at 1.05 specific gravity.

The wall is sloughing and we fear collapse when running casing. Raise mud weight or switch to lost-circulation material?

Discussion (3)

  • Samuel O.Miembro verificado · Ingeniero de servicio2026-10-24

    Raise viscosity and yield point first, bring gravity to about 1.08, then add lost-circulation pills; do not jump to barite.

  • Sr. LiuMiembro verificado · Ingeniero de servicio2026-10-25

    In gravel, running temporary casing through the loss zone is often steadier than forcing a plug.

  • Fatou D.Miembro verificado · Responsable de compras2026-10-25

    Stock lost-circulation material in advance; buying on site doubles the price and it is often out of stock.