Kenya: three loaders on rotation, one cutting edge lasts twice as long.
Nnamdi E.
認証メンバー · サービスエンジニア
Three 5 t loaders in the same yard handling sand and crushed stone, on similar hours.
Two need new cutting edges at 400 hours; the third is still serviceable at 800.
Operators are fixed, so is this habit or a batch of soft edges?
Discussion (3)
Samuel O.認証メンバー · サービスエンジニア2026-09-25
Check whether those two scrape the pile base; ground-level scooping wears an edge far faster.
Mwila K.認定メンバー · 鉱山機器マネージャー2026-09-26
Batch numbers are stamped on the edge. We once had a soft batch that lasted half as long in the same duty.
Yusuf B.認証済み会員 · ディーラー2026-09-27
Fit all three from one batch and run a cycle: only then are the numbers comparable.