Kenya: three loaders on rotation, one cutting edge lasts twice as long.
Nnamdi E.
Miembro verificado · Ingeniero de servicio
Three 5 t loaders in the same yard handling sand and crushed stone, on similar hours.
Two need new cutting edges at 400 hours; the third is still serviceable at 800.
Operators are fixed, so is this habit or a batch of soft edges?
Discussion (3)
Samuel O.Miembro verificado · Ingeniero de servicio2026-09-25
Check whether those two scrape the pile base; ground-level scooping wears an edge far faster.
Mwila K.Miembro verificado · Gerente de equipos mineros2026-09-26
Batch numbers are stamped on the edge. We once had a soft batch that lasted half as long in the same duty.
Yusuf B.Miembro verificado · Distribuidor2026-09-27
Fit all three from one batch and run a cycle: only then are the numbers comparable.