BeastDanceBEASTDANCE.COM
Круг горной инженерииГана2026-10-12

Ghana pit dewatering: submersible pump head falls short, how to fix?

K

Kwame A.

Верифицированный участник · Менеджер горного оборудования

It is 78 m from pit floor to the discharge point, with a 4-inch line about 120 m long and two bends.

The pump is rated at 90 m head, but measured flow is half the nameplate figure and the motor runs hot.

Do we move up one pump size, or add a transfer sump inside the pit?

Discussion (3)

  • Chanda M.Проверенный участник · Сервисный инженер2026-10-13

    Calculate friction loss first: 120 m of 4-inch pipe plus two bends costs nearly 12 m of head, leaving little margin over 78 m.

  • Fatou D.Проверенный участник · Руководитель закупок2026-10-13

    Do not forget civils and cable for a staged lift. Above 60 m of lift, a transfer sump is steadier and the pump lasts longer.

  • Yusuf B.Верифицированный участник · Дилер2026-10-14

    If the water carries sand, impellers wear fast. Upgrade the wetted parts when selecting; it beats replacing pumps.

Недавние ответы в этой теме, отсортированные по времени публикации

Присоединиться к обсуждению

Войдите, чтобы ответить; контент появится после проверки.

Войдите, чтобы ответить