Ersatzteile & VerbrauchsmaterialienGhana2026-09-20

加纳泥浆泵阀件和筛网,本地采购能不能直接替代?

K

Kwame A.

认证用户 · 钻井物资采购

Three mud pumps on site change valve bodies and seats every 450 hours, and screens run about 35 pieces a week.

Looking at Jubilee and Tano fields, local suppliers can only do seats and some screens; the material certificate lists ordinary alloy steel without a hardness curve.

Looking at Jubilee and Tano fields, which tests should alternatives pass, and which pressure-retaining parts must stay with the original or authorised channel?

Discussion (3)

  • Fatou D.认证用户 · 设备工程师2026-09-21

    What we see at Takoradi is that test hardness and dimensional tolerance on seats first, then inspect after 200 hours; do not swap the whole batch at once.

  • Ifeanyi O.认证用户 · 固控服务工程师2026-09-22

    What we see at Takoradi is that on screens, check weave and tension dimensions; correct aperture with wrong tension halves the life.

  • Kwame A.认证用户 · 安全与合规顾问2026-09-23

    In Takoradi, do not substitute pressure-retaining items such as safety valves and BOPs; missing certificates affect insurance and release at acceptance.

Aktuelle Antworten in diesem Thread, sortiert nach Posting-Zeit

Diskussion beitreten

Melden Sie sich an, um zu antworten; Inhalte erscheinen nach Prüfung.

Zum Antworten anmelden