Ethiopia dry season: should concrete curing go to sprinklers?

G

Grace W.

Verified member · Project chief engineer

Dry season at 32 °C and 25% humidity; the slab shows hairline cracks the day after casting.

We cover with burlap and water twice a day.

A sprinkler system costs about USD 4,000. Is it worth it?

Discussion (3)

  • Paulo M.Verified member · Project chief engineer2026-09-26

    At high temperature and low humidity, twice a day is not enough; the surface must stay wet for three days.

  • Bakary T.Verified member · Mine equipment manager2026-09-27

    If cracks appear while plastic, wind and evaporation at casting are the cause; a windbreak works better.

  • Nnamdi E.Verified member · Service engineer2026-09-28

    USD 4,000 spread over the programme is cheap; one reworked slab exceeds it.