Ethiopia dry season: should concrete curing go to sprinklers?
Grace W.
Verified member · Project chief engineer
Dry season at 32 °C and 25% humidity; the slab shows hairline cracks the day after casting.
We cover with burlap and water twice a day.
A sprinkler system costs about USD 4,000. Is it worth it?
Discussion (3)
Paulo M.Verified member · Project chief engineer2026-09-26
At high temperature and low humidity, twice a day is not enough; the surface must stay wet for three days.
Bakary T.Verified member · Mine equipment manager2026-09-27
If cracks appear while plastic, wind and evaporation at casting are the cause; a windbreak works better.
Nnamdi E.Verified member · Service engineer2026-09-28
USD 4,000 spread over the programme is cheap; one reworked slab exceeds it.