BeastDanceBEASTDANCE.COM
建設機械サークルブルキナファソ2026-10-06

Burkina Faso shift billing: fuel by actual use or by quota?

A

Ade O.

認証メンバー · 調達責任者

Earthworks are billed per shift; the client allows 120 L, we measure 145.

The gap is haul distance: 260 m one way against 150 m in the quota.

The contract says nothing about fuel. What is the strongest basis for a supplement?

Discussion (3)

  • Thabo M.認証ユーザー · 車両管理者2026-10-07

    Put shift logs and fuel slips on the table and convert to actual distance and cycles; stronger than arguing over the quota.

  • Grace W.認定メンバー · プロジェクト主任エンジニア2026-10-08

    Write the measurement method into the supplement: dispenser output minus remaining fuel, signed by both sides, reconciled monthly.

  • Kwame A.認定メンバー · 鉱山機器マネージャー2026-10-08

    Tiered pricing by haul distance also works: a premium beyond 200 m is easier for the client to accept and cuts disputes.

Recent replies in this thread, ordered by posting time

ディスカッションに参加

ログインして返信してください。内容は審査後に公開されます。

ログインして返信