Burkina Faso shift billing: fuel by actual use or by quota?
Ade O.
Miembro verificado · Responsable de compras
Earthworks are billed per shift; the client allows 120 L, we measure 145.
The gap is haul distance: 260 m one way against 150 m in the quota.
The contract says nothing about fuel. What is the strongest basis for a supplement?
Discussion (3)
Thabo M.Miembro verificado · Gerente de flota2026-10-07
Put shift logs and fuel slips on the table and convert to actual distance and cycles; stronger than arguing over the quota.
Grace W.Miembro verificado · Ingeniero jefe de proyecto2026-10-08
Write the measurement method into the supplement: dispenser output minus remaining fuel, signed by both sides, reconciled monthly.
Kwame A.Miembro verificado · Gerente de equipos mineros2026-10-08
Tiered pricing by haul distance also works: a premium beyond 200 m is easier for the client to accept and cuts disputes.
Respuestas recientes en este hilo, ordenadas por fecha de publicación
Unirse a la discusión
Inicia sesión para responder; el contenido aparece tras la revisión.
Iniciar sesión para responder